[Feb-2025] Microsoft MB-335 Actual Questions and Braindumps
Pass MB-335 Exam with Updated MB-335 Exam Dumps PDF 2025
Microsoft MB-335 exam is a certification exam designed for professionals looking to validate their expertise in the field of supply chain management using Microsoft Dynamics 365. MB-335 exam is specifically designed for functional consultants who specialize in supply chain management and wish to prove their proficiency in implementing and configuring the Dynamics 365 Supply Chain Management application.
NEW QUESTION # 30
A company uses engineering change management in Dynamics 365 Supply Chain Management. The Product readiness checks feature is turned off.
An existing engineering product must be reconfigured for a new product readiness policy.
You need to change the product readiness policy.
Where should you make this change?
- A. released product
- B. engineering category
- C. product configuration model
- D. shared product
- E. default order settings
Answer: B
Explanation:
* Product readiness policies are assigned to products at the released product level1. A released product is a product that has been released to one or more legal entities and can be used in transactions2.
* To change the product readiness policy for an existing engineering product, you must go to the Product readiness tab on the Released product details page and select a different policy from the Readiness policy field1.
* The other options are not correct, because they are not related to product readiness policies. Default order settings are used to define how a product is ordered, received, and sold2. A shared product is a product that is defined in the shared product master and can be released to multiple legal entities2. An engineering category is a category that is used to group engineering products by their characteristics3.
A product configuration model is a model that defines the options and rules for configuring a product.
NEW QUESTION # 31
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source. Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 32
You are configuring a service management system that includes subscription billing.
The current system lacks functionality to accurately calculate and collect data about accrued subscription revenue.
You need to set up the accrual of subscription revenue to ensure accurate financial reporting.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Configure the WIP - subscription account and Accrued revenue - subscription account.
- B. Enable revenue accrual on a subscription group.
- C. Configure the WIP - subscription account and Accrued revenue - on account.
- D. Disable revenue accrual on a subscription group.
Answer: A,B
NEW QUESTION # 33
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.
Does the solution meet the goal?
- A. Yes
- B. No
Answer: B
Explanation:
The solution does not meet the goal. Here is the explanation:
* To ensure that the system is set up to support the process manufacturing of pain-relieving lotions, you should use the following steps1:
* Create a product master for the lotion and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
* Create a constraint-based product configuration model for the lotion and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the lotion. For example, you can add an attribute for ingredient A and specify its concentration as a value. You can also add constraints to limit the combinations of attribute values that are allowed.
* Create a price model for the lotion and link it to the product configuration model. On the Price
* models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for ingredient A and specify different prices for different concentrations.
* Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the lotion. You can also view the price details and see how each price component contributes to the total price.
* The solution in the question is not correct, because it does not involve constraint-based product configuration or price models. Creating a dimension-based product master with variants and using trade agreements to specify different pricing would not allow you to handle different concentrations of ingredients or calculate prices based on attributes.
1: Product configuration overview : Create constraint-based configuration : Price models
NEW QUESTION # 34
You need to set up the correct production solution for the assembly are a. Which solution should you implement?
- A. Standard warehousing with Manufacturing execution
- B. Advanced warehousing for all transactions
- C. Standard warehousing for all transactions
- D. Advanced warehousing with Manufacturing execution
Answer: D
NEW QUESTION # 35
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?
- A. [Trim==Legend|Seat==ML]
- B. Implies[Trim==Legend,Seat==ML]
- C. Seat!=ML
- D. Implies[Seat==ML,Trim==Legend]
Answer: D
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/expression-constraints-table-constraints-produc
NEW QUESTION # 36
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/operation-sch
NEW QUESTION # 37
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. machined plastic pieces
- B. excess plastic
- C. mold tooling
- D. unmachined plastic pieces
Answer: A,D
NEW QUESTION # 38
A company produces homeopathic lotions (or pain relief and uses Dynamics 365 Supply Chain Management.
Several components used in the production of the pain-relieving lotion and oils have special government-mandated reporting requirements.
You need to ensure the company can provide the appropriate reporting and tracking for these components.
Which parameters should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
NEW QUESTION # 39
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture' receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
To select the maintenance request components to use, you should use the following:
* The leased car that must be repaired: You should use the Inbound asset component. An inbound asset is an asset that is received from a customer or vendor for maintenance or repair1. You can use the Inbound assets page to create and manage inbound assets in Asset Management2. You can also create a maintenance request for an inbound asset and link it to a work order3.
* The replacement car for the leased car: You should use the Outbound asset component. An outbound asset is an asset that is sent to a customer or vendor as a temporary replacement for an asset that is being maintained or repaired1. You can use the Outbound assets page to create and manage outbound assets in Asset Management. You can also link an outbound asset to an inbound asset or a work order.
1: Inbound and outbound assets 2: Inbound assets 3: Create a maintenance request for an inbound asset :
[Outbound assets]
NEW QUESTION # 40
You need to resolve the issue reported by Buyer1.
Which two features should you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Assign new engineering version for parent BOM.
- B. Assign lifecycle state for subassembly.
- C. Assign lifecycle state for parent BOM.
- D. Disable active for planning for lifecycle status.
- E. Enable active for planning for lifecycle status.
Answer: B,E
NEW QUESTION # 41
A company uses Dynamics 365 Supply Chain Management.
The company wants to use the distributed hybrid topology model to alleviate performance issues at some of its distribution centers. The company has a manufacturing plant, PlantA, which resides at the same physical location as the company home office in FranlFurt Germany.
The company has the following distribution locations:
* Distribution1 covers Ireland.
* Distribute covers the United Kingdom.
* Distribution convers Belgium Germany, and the Netherlands
* Distribution5 covers the Shetland islands.
All distribution warehouses use Dynamic 365 Supply Chain Management to receive and distribute goods from PlantA.
Wherehouse personal use the warehouse app to perform their job function. Because of their proximity to each other, Distribution1, 2, and 3 are managed together and frequently transfer goods between each location.
Due to several connection issues with Dynamic 365 Supply Chain Management, the Shettland islands location struggles to perform tasks.
The company must maintain as little of its own IT infrastructure as possible, especially in remote areas, but still daily activities at all locations.
You need to recommend the appropriate topology configuration.
Which type of scaled should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
NEW QUESTION # 42
A company manufactures high performance bicycles.
The bicycles come in several different preconfigured models. Customers can also purchase custom configurations. Several add-ons are dependent on other accessories in order to be installed.
You need to set up the system to handle the different product configurations.
What should you do?
- A. Create a batch version.
- B. Create an expression constraint.
- C. Create a phantom BOM.
- D. Create a co-product.
Answer: C
NEW QUESTION # 43
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Set product readiness to automatic.
- B. Set product readiness to manual,
- C. Change product lifecycle state.
- D. Copy link and products.
- E. Define business impact.
Answer: B,C,E
Explanation:
Topic 5, Adatum CorporationAdatum Corporation is a multi-entity
corporation located in Seattle, Washington in the United States. The
company is a leading producer of specialty cakes and cookies. The
company also manufactures specialty chocolates that use ethically
sourced ingredients from around the world. The company plans to
launch a new product line of organic chocolates later this year.
Adatum plans to implement Dynamics 365 Finance and Dynamics 365 Supply Chain Management to manage financials, inventory, and manufacturing capabilities across the entire organization.
* Manufactured products are stored at the distribution warehouses until they are shipped to customers.
* Individually branded pre-packaged cake and cookie mixes are supplied to specialty cafes and restaurants.
The mixes are shipped directly to the cafes and restaurants from the production factories.
* The company maintains a fleet of trucks and also subcontracts shipments between the factories and warehouses to outside vendors.
* The mixes and specialty chocolates are based on standard recipes that use precise ingredient ratios. There are strict rules around ingredient substitutions.
* All mixes use one of three base recipes as their foundation: BaseA, BaseB. and BaseC. Additional ingredients, spices, and flavorings are then added to make the final product.
* BaseA and BaseB are made in large batches and stored until they are used in the other mixes.
* Mixes with BaseA have a shelf life of six months due to the type of flour it uses.
* Specialty chocolates are manufactured only during the holiday season.
* Specialty desserts are offered during the holiday season. This year, customers may specify additional icing colors and cake layers when placing orders. Depending on the popularity of two of the new colors, they may be offered the next year.
* Cocoa oil that is extracted during the production of some of the specialty chocolates is used in the BaseB foundation mix.
* Cleaning and setup of machinery between products has been causing delays in production.
* Prices of raw ingredients such as sugar can fluctuate greatly depending on seasonal and worldwide demand.
* To properly record profitability, ail raw materials use the first in, first out (FIFO) costing method, while finished products are recorded at standard costs.
* Large fluctuations have been occurring at month end in costs reported due to the inability to track production runs that span from month-to-month.
* Leftover flour and sugar from production runs are collected, packaged, and donated to local food banks if the amount is too small to use in other runs.
* To maintain Adatum's certification as a manufacturer of ethically sourced ingredients, the traceability of every ingredient in all products to their source must be tracked.
* All products must be randomly tested for adherence to quality standards for ingredient makeup and weight.
* Similar recipes must be able to be produced in succession to limit machinery cleaning and setup times.
* All costs must be tracked for each production run and be able to be reconciled at the end of the monthly accounting cycle, including any work in process (WIP) costs and donations.
* The organic chocolate line must be set up. The ingredients cannot be mixed with non-organic ingredients in inventory.
* Mixes are generally stored and sold in 16-ounce bags. Some quantities are sold and distributed in 5. 10. and
20-gallon containers to large restaurants.
* Each mix has a single unique item number and is tracked per batch produced.
* Specialty chocolate products must be stored in climate-controlled areas of the warehouse.
* QA TesterA discovers during a random test that the batch of a mix does not contain the necessary amount of IngredientB.
* VendorZ, who transports finished goods from PlantA to Warehouses, is consistently late picking up product.
* OperatorA must consolidate partial mix batch group runs into saleable package quantities.
* UserB must set up the mix items.
* UserC learns that mixes containing BaseA have been stamped with a batch date from the flour vendor and is not being calculated from the mix manufacturing date. The mixes from the past month that might be impacted need to be identified and the calculation needs to be corrected.
* UserD must update the costs of finished goods. Accounting wants labor calculated in WIP based on how much time an individual spends performing the operation, as well as the finished goods to post to a specific different ledger account.
* UserE must set up and maintain the cost of sugar.
* UserF must decrease downtime for the machinery.
* UserG must plan the specialty desserts for the current holiday season.
NEW QUESTION # 44
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution. Determine whether the solution meets the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.
A manufacturing company has a new speaker that is available with standard and premium carbon fiber options.
For the premium option, speakers are made to order. Customers can choose from seven product attributes at different prices.
You need to create and configure the product and pricing for the new speaker.
Solution: Create a constraint-based product with configurations. Use a price model to calculate the different configurable option costs.
Docs the solution meet the goal?
- A. No
- B. Yes
Answer: B
Explanation:
Explanation
The solution meets the goal. Here is the explanation:
To create and configure the product and pricing for the new speaker, you should use the following steps1:
Create a product master for the speaker and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
Create a constraint-based product configuration model for the speaker and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the speaker. For example, you can add an attribute for carbon fiber options and specify Standard and Premium as the values. You can also add constraints to limit the combinations of attribute values that are allowed.
Create a price model for the speaker and link it to the product configuration model. On the Price models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for carbon fiber options and specify different prices for Standard and Premium values. You can also add price components for other attributes that affect the price of the speaker.
Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the speaker. You can also view the price details and see how each price component contributes to the total price.
1: Product configuration overview : Create constraint-based configuration : Price models
NEW QUESTION # 45
You need to configure the solution for the two issues the production manager reported.
How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
NEW QUESTION # 46
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
The company requires that employees register time against each machine on the shop floor.
You need to configure the system so that employees can register time.
Which two configurations must be set up? Each answer represents a partial solution NOTE Each correct selection is worth one point.
- A. machines as a resource
- B. time registration workers
- C. registration workflow
- D. electronic timecard parameter
Answer: A,B
NEW QUESTION # 47
You need to set up the chocolate items.
Which values should you select? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation:
NEW QUESTION # 48
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.

Answer:
Explanation:
Explanation:
NEW QUESTION # 49
You need to resolve the ModelA charging issue.
Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Worker
- B. Ignore schedule
- C. Asset
- D. Tool
- E. Ignore scheduled execution
Answer: C,D
NEW QUESTION # 50
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration
NEW QUESTION # 51
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
A screen shot of a computer Description automatically generated
NEW QUESTION # 52
......
Latest MB-335 Pass Guaranteed Exam Dumps with Accurate & Updated Questions: https://www.dumps4pdf.com/MB-335-valid-braindumps.html
MB-335 Exam Brain Dumps - Study Notes and Theory: https://drive.google.com/open?id=10B7HSrjToq7b9TJEbU780X0iYgpJRf7e