The MB-330 exam covers a range of topics, including product information management, inventory management, warehouse management, transportation management, and quality management. MB-330 exam also evaluates the consultant's ability to configure and manage purchasing and sales orders, as well as cost accounting and budgeting. Candidates are expected to have hands-on experience with Dynamics 365 Supply Chain Management and a solid understanding of supply chain concepts.


Microsoft MB-330 certification exam is an important credential for individuals who are interested in pursuing a career as a Microsoft Dynamics 365 Supply Chain Management Functional Consultant. It tests the candidate's knowledge and skills in the areas of implementing and configuring supply chain management, inventory management, procurement and sourcing, and warehouse management in Microsoft Dynamics 365. Microsoft Dynamics 365 Supply Chain Management Functional Consultant certification is globally recognized and highly valued by organizations that use Microsoft Dynamics 365.


Microsoft MB-330 Certification Exam cost is as follow

  • The price of Microsoft MB-330 exam is $165 USD.

 

NEW QUESTION # 88
A distribution company uses Dynamics 365 Supply Chain Management
Users in the warehouse must have the ability to create process transfer orders from a mobile device.
You need to complete setup.
Which areas should you configure?

Answer:

Explanation:


NEW QUESTION # 89
A company opens a new warehouse facility.
You need to receive items on a transfer order by using an arrival overview.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/inventory/arrival-overview


NEW QUESTION # 90
Hotspot Question
A company uses several freight carriers. Freight is calculated by mileage.
You need to configure the system.
Which values should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/transportation/transportation- management-engines


NEW QUESTION # 91
You need to configure the system to support regional sales requirements.
Which group assignments should you use? To answer, select the appropriate options in the answer area.
NOTE. Each correct selection is worth one point.

Answer:

Explanation:

Explanation:

Reference:
https://www.dynamics-tips.com/sales-and-marketing/how-to-calculate-and-process-sales-commissions
Topic 1, Wide World Importers
This is a case study, Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements, if the case study has an All Information tab. note that the information displayed is identical to the information displayed on the subsequent tabs. When you ate ready to answer a question, click the Question button to return to the question.
Background
Wide World importers is a distribution company whose primary customers are small boutique shape which sell globally-sourced products including unique or hand-crafted items such as performs and ceramicware. Through the Wide World Importers sales cycles, the commissions-based sales team identifies opportunities and negotiates with shops by using a quoting process. The products may or may not already exist in the company's current product list.
The company has the following divisions and areas of responsibility:

Current environment
Wide World Importers use Dynamics 365 Finance and Dynamics 365 Supply Chain Management There is a single legal entity.
The primary distribution center for the company is located Las Vegas. Nevada, USA There is an additional warehouse in California which receives imported goods from container ships. When goods are received in California, the goods are transferred to Nevada for distribution. No orders are shipped directly from California.
Sales
The company has two teams of sale representatives East and West. Each team has one representative for each of the following categories of goods; perfumes, ceramicware ano ail other goods. Sales representatives are paid commissions based on sales Commissions must be paid based on the home office location for customers.
For example, commission for a customer that is headquartered in the Western United States is paid to the West group of sales representatives.
Sales representatives are responsible for driving new business. Company executives must be able to see metrics define the companies that the sales representatives are targeting, where there is potential to do business, and where quotes are being generated. Customer records must not be created until a sale is confirmed.
The sales team quoted a new perfume for a customer named Customer1. The customer has shipping locations in the following regions. United States, Austria. and Japan. Sales must only be made to the US and Japan due to product ingredients. Automated checks must be put into place so that users do not have to remember to select the correct item.
Testing
The company periodically performs testing on ceramicware as it is received to determine whether the products contain lead The company labels and markets ceramicware as Lead Free or Not for food use Perfumes may contain restricted ingredients that cannot be sold to customers in the European Union. The company performs testing on perfumes and has processes to ensure that perfumes containing restricted ingredients are not sold to customers in Europe.
Ten percent of all ceramiavare items received must be tested for lead. The process for managing testing must be automated. There must be tolerances setup that define the acceptable amount of lead levels in a product.
Inventory management
The inventory team must control costing of items by using FIFO principles. The finance team must be able to see updated FIFO adjustments throughout the month but win only settle FIFO for month-end reporting Inventory close must lie run at the end of each month. A report must be provided to the finance team that includes the physical quantities and inventory value for items, with totals at the bottom. The warehouse team needs a similar report but does not want the inventory value included. During inventory close, some items cannot be fully costed because the issue cannot be settled against the receipt. The finance team must know which items were excluded.
Other inventory requirements
* Inventory must be reserved against physical inventory.
* Items must be grouped so that the inventory costing can posted to the ledger by using the following groups:
perfumes, ceramicware. other goods. All goods are FIFO. Financial reports must be grouped by these three categories, even the transactions from all categories posts to the same ledger accounts.
* Wide World Importers plans to import a specific type of pottery from a local company in Mexico that handmakes the goods. The pottery must be available in orange of red colors. The cost is the same regardless of the color selection.
* A new line of perfumes is being introduced. The procurement team must be able to identify which perfumes are men s or women's fragrances, and must be able to further categorize perfumes as Perfume. Eau de Perfume, Eau de Toilette. Eau de Cologne, or Eau Fraiche.
* You must set up a structure of products for classifying each item for purchase, sales and reporting analysis Issue Customer service representatives report that some inventory shows as ordered reserved when the ordered reserved parameter is turned off.
An item that is typically carried is out of stock. A stock. A customer named Customer2 wants to place a special rush order for the item. This will result in a significantly increased cost from the supplier. The finance team does not want to have this special order affected the FIFO tiers.


NEW QUESTION # 92
You need to configure the system to support the pottery line.
What should you do first?

  • A. Create a new product master with pre-defined product variants.
  • B. Create a new product with tracking dimensions.
  • C. Set up a new product with product configuration.
  • D. Create a new product with storage dimensions.

Answer: A

Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/tasks/create-predefined-product-variants Implement Product information management Testlet 3 This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
Adventure Works Cycles builds stock and custom mountain bikes and is headquartered in San Diego. It has the following assembly and warehouse locations:
* Denver, Colorado, United States
* San Diego, California, United States
* Budapest, Hungary
Most manufacturing is outsourced, with each facility only assembling the bikes. Parts are stocked at all facilities and may be transferred between warehouses or legal entities. All of the parts are at standard cost.
Current environment. Organizational structure
The following diagram shows the structure of Adventure Works Cycles.
* Each of the physical locations in the United States (US) is a warehouse.
* Hungary assembles and distributes products to the rest of the European Union (EU).
* The EU legal entity is expected to add additional warehouse locations.
* All legal entities roll up to a financial consolidation company.

Current environment. Purchasing
* Higher quality tires that are used in new orders have become popular. Due to the volume of orders, the company wants to negotiate pricing with VendorC. The vendor agrees to a discounted price for 500 tires purchased within the next six months. Once the 500 tires have been purchased, the discount will be re- evaluated based on demand.
* Once a purchase is approved, for audit purposes it cannot be changed.
* Whenever possible, parts are purchased from vendors also within the EU. A purchase order was placed for a bike seat manufacturer in Italy.
* Parts for custom orders may not always be kept in stock and will need to be procured.
Current environment. Purchasing requisitions
The following flow chart depicts the purchase requisition process:

Requirements. Purchasing
* Items for purchase requisitions are governed by each country. Each of the country-specific products will be grouped together for selection.
* Purchase orders must follow the requisition process.
* All existing purchase orders for brakes must account for the change to VendorB.
Requirements. Inventory
* Standard costs are based on purchase fluctuations within a single month.
* Tires use floating zones due to limited warehouse space.
Requirements. Operations
Due to recent brake failures, Adventure Works Cycles plans to purchase brakes from VendorB instead of VendorA. Although the brakes from Vendor B will continue to use the same item number as the brakes from VendorA, the price is slightly higher from VendorB. Adventure Works Cycles will pay list price from VendorB.
The order for VendorB needs approval and the usual approver for purchase requisitions is on vacation.
All brakes from VendorA that are in stock must be tested. The process for brake testing must be implemented for all inbound orders. Quality orders must be automatically created upon receipt of the first shipment against a purchase order only.
UserC needs to consolidate brake inventory after it has been cleared for sale.
Ordering of the new brakes order will incur an additional cost because it is a rush order.
Requirements. Custom orders
* Custom orders are placed for items that do not exist in the item master.
* Hungary does not process custom orders.
* The United States does process custom paint orders. Most custom paint colors are special order and require purchase requisitions.
* Quotes must be obtained from a minimum of two suppliers per company policy and compared for the shipping, costs, and other variables. Quotes will not be selected based on lowest price only.
Issues
* A special order for 26 high-end tires is received. This item is no longer in stock from the current vendor.
* Goods have been received in stock, but the matching invoice has not yet been received at the time of month close.
* UserA needs to set up pricing for the items purchased from VendorC and ensure that accounting validates the receipt and invoice against the agreement.
* UserB needs to send out a request for quotation (RFQ) for custom paint. The vendor will be selected based on pricing, volume discounts, and lead time.
Implement Inventory management
Question Set 1


NEW QUESTION # 93
A distribution company uses Dynamics 365 Supply Chain Management.
A high-volume warehouse for the distribution company automatically releases transfer order lines to the warehouse throughout the day.
Order line quantities are frequently changed after release to the warehouse. However, the load lines are not always updated.
You need to configure automatic updates to the load lines.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Box 1: Configure Warehouse parameters
Turn on the auto-update shipment functionality
To turn on the auto-update shipment functionality, follow these steps.
Go to Warehouse management > Setup > Warehouse > Warehouses.
Select warehouse 24.
On the Warehouse FastTab, in the Auto update shipment field, change the value from On quantity decrease to Always.
After you change the value to Always, any increases or decreases in the quantities on sales order lines and transfer order lines, and any additions of new lines, are reflected on shipments and loads for the selected warehouse, given the previously mentioned update constraints.
Box 2: Disable automatic work creation.
Change the wave template so that load lines aren't automatically processed To configure the wave template so that it doesn't automatically process load lines, follow these steps.
Go to Warehouse management > Setup > Waves > Wave templates.
Select wave template 24 Shipping default.
Select Edit.
On the General FastTab, set the Automate wave creation option to Yes, and make sure that all other options are set to No.
It's important that no work be automatically created and released as part of the wave creation process. After work is created that is related to the load line that was created for the sales order line, the load line is no longer automatically updated if the quantity on the sales order line is changed.
Reference: https://learn.microsoft.com/en-us/dynamics365/supply-chain/warehousing/auto-update-shipment


NEW QUESTION # 94
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C0001 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Open the Restricted products regional lists from
2 - Create an inclusive list type for the United States
3 - Create an exclusive list type for California, United States
4 - Add item C0001 to the restricted product lists


NEW QUESTION # 95
You need to implement location directives in Dynamics 365 for Finance and Operations.
Which objects should you use? To answer, drag the appropriate objects to the correct permissions. Each object may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 96
You need to implement the master planning solution for Adventure Works.
Which solutions should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Table Description automatically generated

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/new-master-planning-engine
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/get-started


NEW QUESTION # 97
A company has several vendors who require 1099s.
You need to set up the vendors so that year-end reports can be correctly generated.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation


NEW QUESTION # 98
A company must set up replenishment of inventory using vendor-owned consignment inventory.
You need to create the replenishment order.
How should you complete the replenishment order? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:

References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/inventory/tasks/create- consignment-replenishment-order


NEW QUESTION # 99
Employee 1 needs to set up the new items for the product line
Which two actions should Employee1 perform? Each correct answer presents part of the solution.
NOTE Each correct selection is worth one point.

  • A. Create new finished goods and release to the legal entity
  • B. Create new raw materials with variants and release to the legal entity.
  • C. Create new finished goods with predefined variants and release to the legal entity.
  • D. Create new raw materials and release to the legal entity.
  • E. Create new finished goods and release to the legal entity. Raw material products are not required for these items.

Answer: C,D


NEW QUESTION # 100
You must configure the acrylic paint requirements.
What should you configure? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 101
All items that a company purchases from a specific vendor arrive with defects.
You need to automatically generate quality orders for all items when the products are physically received from the vendor, and product receipts are issued.
How should you configure the quality association? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Graphical user interface, application Description automatically generated

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/inventory/quality-orders
https://docs.microsoft.com/en-us/dynamics365/supply-chain/inventory/quality-associations


NEW QUESTION # 102
A company is implementing Dynamics 365 Supply Chain Management. The company uses subcontracted services on its bills of material (BOMs).
You must set up and release a subcontractor item so that it can be included on the BOM and subcontractor charges are included in the BOM calculation. Because the subcontractor is a step included in a BOM but not a tangible item, inventory for the item must not be tracked in the warehouse.
You need to set up the subcontractor item and release the item to the company.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Box 1: BOM line
You must set up and release a subcontractor item so that it can be included on the BOM and subcontractor charges are included in the BOM calculation.
To be considered in planning and cost calculation, the service must be added to the BOM. The BOM line must be of the Vendor type, and it must be allocated to the route operation that the service is allocated to. This route operation must have a costing resource and resource requirement that point to a resource of the Vendor type that connects the operation and the related service to the corresponding vendor account.
Box 2: Clear stocked product
Because the subcontractor is a step included in a BOM but not a tangible item, inventory for the item must not be tracked in the warehouse.
Subcontracting of route operations
To use subcontracting of route operations for production or batch orders, the service product that is used for the procurement of the service must be defined as a product of the Service type. Additionally, it must have an item model group that has the Stocked product option under Inventory policy set to Yes. This option defines whether a product is accounted as inventory on product receipt (Stocked product = Yes), or whether the product is expensed on a profit and loss account (Stocked product = No). Although this behavior might seem contradictory, it's based on the fact that only products that have this policy will create inventory transactions that can be used in cost control to calculate planned cost and determine the actual cost when a production order is ended.
Reference:
https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/manage-subcontract-work-produ


NEW QUESTION # 103
A company uses Dynamics 365 Supply Chain Management to manage maintenance requests by using asset management.
The company requires the creation of automatic assets for a functional location.
You need to configure the data.
Which two configurations should you use? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. lifecycle state
  • B. functional location type
  • C. asset type default
  • D. attribute types
  • E. functionality profiles

Answer: B,C

Explanation:
Asset type default: This configuration ensures that a default asset type is associated with a functional location. When a functional location is created, the system uses the default asset type to create assets automatically.
Functional location type: Functional location types define the structure and behavior of functional locations, including how assets are created and managed for those locations. Setting up a functional location type is necessary to enable the automatic creation of assets for a functional location.


NEW QUESTION # 104
You manage a Dynamics 365 for Finance and Operations system for a company.
You need to configure agreements in the system.
Which agreement types should you use? To answer, drag the appropriate agreement types to the appropriate scenarios. Each agreement type may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 105
A company uses Dynamics 365 Supply Chain Management.
The company obtains packaging cartons in metric tons and sells them as individual items. The packaging cartons come in various sizes and are maintained as product variants.
You need to configure unit conversion for the packaging cartons.
What should you do?

  • A. Disable unit of measure conversions in the product master. Configure the inter-class unit conversion feature in the Organization administration module.
  • B. Enable unit of measure conversions in the product master. Configure the intra-class unit conversion feature in the released product.
  • C. Enable unit of measure conversions in the product master. Configure the inter-class unit conversion feature in the Organization administration module.
  • D. Enable unit of measure conversions in the product master. Configure the intra-class unit conversion feature in the Organization administration module.

Answer: C

Explanation:
Reference:
https://docs.microsoft.com/en-us/business-applications-release-notes/april19/dynamics365-finance-operations/uo


NEW QUESTION # 106
New order items arrive from vendors and come into a company's main warehouse.
You must set up internal transportation processes in Dynamics 365 for Finance and Operations to distribute goods to other locations.
You need to set up inbound orders through transportation management.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Answer:

Explanation:

Explanation:


NEW QUESTION # 107
You are the inventory manager for a distribution center. You are configuring the inventory breakdown for a new center in California.
You need to set up warehouse locations for the center and configure the prerequisite inventory hierarchy.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:


NEW QUESTION # 108
A company uses Dynamics 365 Supply Chain Management to manage procurement operations.
A purchasing clerk must process a purchasing request from an offshore vendor with the landed cost.
You need to explain the steps needed to perform this process
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions To the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:


NEW QUESTION # 109
......

Free MB-330 Test Questions Real Practice Test Questions: https://www.dumps4pdf.com/MB-330-valid-braindumps.html

View MB-330 Exam Question Dumps With Latest Demo: https://drive.google.com/open?id=1niDihEzmfm0YkHncm2WwC39yMcyPPaM1